Timahoe North Project,

Co. Kildare

 

Environmental Impact Assessment Report

EIAR Volume 1 - Non-Technical Summary and Main Report
Cover & Table of Contents - Vol 1
Non Technical Summary
1. Introduction
2. Background
3. Site Selection and Alternatives
4. Description
5. Human Beings
6. Flora and Fauna
7. Geology and Soils
8. Water
9. Air & Climate
10. Noise
11. LVIA
12. Cultural Heritage and Archaeology
13. Material Assets
14. Interaction
15. Schedule of Mitigation
EIAR References

EIAR Volume 2 - Photomontage Booklet
Cover Page
View Point location map
View Point 1
View Point 2
View Point 3
View Point 4
View Point 5
View Point 6
View Point 7
View Point 8
View Point 9

EIAR Volume 3 - Appendices 2-1 to 6-2
Cover & Table of Contents - Vol 3
Appendix 1-1 Curriculum Vitae
Appendix 2-1 Scoping Responses
Appendix 2-2 Public Consultation Documents
Appendix 2-3 ABP SID Decision
Appendix 3-1 PV System Design Report
Appendix 4-1 Site Layout Planning Drawings
Appendix 4-2 Site Amenity Drawings
Appendix 4-3 Construction Methodology
Appendix 4-4 Foundations Construction Methodology
Appendix 4-5 Construction and Environmental Management Plan
Appendix 5-1 EMF Booklet - Eirgrid 2014
Appendix 5-2 EMF Booklet – ESB 2017
Appendix 5-3 Glint and Glare Assessment
Appendix 6-1 Bord na Mona Habitat Classification System
Appendix 6-2 Bat Survey Report


EIAR Volume 4 - Appendices 6-3 to 13-1-4

Cover & Table of Contents - Vol 4
Appendix 6-3 Bird Survey Report
Appendix 6-4 Small Skipper. Irish Biogeographical Society No.37 - 2013
Appendix 6-5 IPCC Survey
Appendix 6-6 Timahoe North Draft Rehabilitation Plan
Appendix 6-7 Kildare Wetland Survey
Appendix 7-1 Peat Stability Risk Assessment
Appendix 7-2 Geology and Ground Conditions Report
Appendix 8-1 Site Drainage Report
Appendix 8-2 Flood Risk Assessment
Appendix 8-3 Laboratory Results
Appendix 9-1 Carbon Calculations
Appendix 10-1 Noise Sensitive Receivers Coordinates
Appendix 10-2 Glossary of Acoustic Terminology
Appendix 10-3 Model Calculation Parameters and Settings
Appendix 10-4 Predicted Noise Levels – Solar Farm Operation
Appendix 10-5 Predicted Noise Levels – Substation Operation
Appendix 10-6 Predicted Noise Levels – Combined Project Operation
Appendix 12-1 Photographic Record
Appendix 12-2 Archaeological Monitoring Report
Appendix 13-1-1 TII Traffic Data
Appendix 13-1-2 Collision Data
Appendix 13-1-3 Traffic Volumes
Appendix 13-1-4 Run Analysis

Natura Impact Statement
Natura Impact Statement